References

Deluxe individual living space 1, Kumodraz, Belgrade

Low temperature system of heating and cooling using renewable energy sources – geothermal probes.

Heating and cooling installation is finished. Construction works and urbanization are coming to the end, after what the system activation is expected.

Više >>

Deluxe individual living space 2, Kumodraz, Belgrade

Low temperature system of heating and cooling using renewable energy sources – geothermal probes.

Heating and cooling installation is finished. Construction works and urbanization are coming to the end, after what the system activation is expected.

Više >>

Deluxe living space with 7 apartments 1, Dedinje, Belgrade

Surface heating and cooling using the energy of heating pump air/water and natural gas.

Heating and cooling installation is being finishing, final construction works are being done.

Više >>

Deluxe living space with 7 apartments 2, Dedinje, Belgrade

Surface heating and cooling using the energy of heating pump air/water and natural gas.

Heating and cooling installation is being finishing, final construction works are being done.

Više >>

Deluxe living space with 10 apartments, Dedinje, Belgrade

Surface heating and cooling using the energy of heating pump air/water and natural gas.

Heating and cooling installation is being finishing, final construction works are being done.

Više >>

Complete reconstruction of the apartment, center, Belgrade

Surface heating and cooling using the energy of the heating pump air/water.

Heating and cooling installation plus control system is finished, construction works are in the final stage, and very soon the whole system activation is expected.

Više >>

Deluxe living space with 8 apartments, Boulevard Oslobodjenja, Belgrade

Surface heating and cooling with the heating pump air/water and natural gas.

This building is settled in in 2008 and apart from interesting architectural solution, it represents the first “Serbian house that feels” using the wall, underfloor and ceiling panels.

Više >>

The Saint Vasilije Ostroski Church, Banjica, Belgrade

Floor heating of the church space including the choir gallery.

The building is finished in 2007 and it is connected to the remote heating system.

Više >>

Saint Luke Church, Dedinje, Belgrade

Floor heating of the church built near by the hospital in Sokobanjska Street.

The church is finished and connected to the remote heating system of the hospital.

Više >>

Motor service and sale, Krnjaca, Belgrade

Floor heating and cooling using the geothermal energy – underground water.

The building is finished and the heating and cooling system has been already used for several years. The basic characteristic is that the whole system is done in order to save energy.

Više >>